Vector resources

Completed work

Major workplace projects

Warehouse relocations, building decommissioning, IT asset disposition, multi-floor furniture installations, and phased workplace moves. Explore the full scope of each project.

Phased Relocation & Installation · August 2026

Pepsi

Ontario, California

Project Wave combined workplace teardown, relocation, and furniture installation across the main, traffic, and satellite offices through coordinated project phases.

  • Phased teardown & relocation
  • Main, traffic & satellite offices
  • Furniture reinstallation

Scope of work

  • Break down benching systems and reception furniture for the relocation phase.
  • Relocate workstations, seating, files, training and break-area furniture, and lockers; temporarily relocate and reinstall office desks as required by the project sequence.
  • Install furniture across the main office, traffic office, and satellite office to the final project floor plan.
  • Document installation completion, site photos, and punch items at handoff.

Documented outcome

Furniture was relocated and reinstalled across the main, traffic, and satellite offices through coordinated project phases. Completion records include site photos and the installation punch list.

Warehouse & Office Relocation · October 2026

All American Print Supply

Cerritos, California

A 40,000 sq ft warehouse and office relocation completed in four days, including commercial printers, pallet racking, warehouse inventory, and office contents.

  • 40,000 sq ft warehouse
  • Completed in 4 days
  • Printers, pallet racks & office move

Scope of work

  • Relocate warehouse operations and the associated office between two Cerritos facilities, with warehouse work sequenced before the office move.
  • Disassemble, transport, re-erect, and level pallet racking at the destination.
  • Disconnect commercial printers from power, move them, and set them in place at the new facility.
  • Transfer palletized inventory and warehouse contents with forklift support.
  • Disassemble, protect, transport, and reassemble office furniture, and relocate office contents and appliances.

Documented outcome

The 40,000 sq ft warehouse relocation was completed in four days, covering commercial printers, pallet racking, inventory, and the associated office move.

Decommissioning, Relocation & ITAD · September 2026

Dell Technologies

Draper, Utah

Entire-building decommissioning and multi-building relocation, with IT asset disposition (ITAD), asset tracking, certificates of destruction, and final facility turnover.

  • Entire-building decommissioning
  • Multi-building relocation
  • ITAD & destruction certificates

Scope of work

  • Decommission entire buildings and coordinate office relocation across multiple buildings.
  • Relocate office furniture and equipment as part of the broader building transitions.
  • Inventory, sort, and quarantine Dell enterprise systems, document Service Tags, and prepare equipment for controlled disposition and recycling.
  • Manage IT asset disposition and provide certificates of destruction as part of the project closeout.
  • Remove remaining furniture and equipment and complete broom-clean facility turnover.

Documented outcome

The work covered building decommissioning, multi-building relocation, IT asset disposition, and facility turnover, with certificates of destruction provided. The Draper project record includes on-site sign-off on September 24, 2026.

Renovation Support · March 2026

Mattel

El Segundo, California

Multi-floor renovation support: office decommissioning, relocation, and reinstallation of artwork, furniture, and employee belongings.

  • Multi-floor renovation
  • Office decommissioning & relocation
  • Furniture & artwork reinstallation

Scope of work

  • Decommission office spaces across multiple floors to support the renovation.
  • Relocate office furniture, artwork, and employee belongings, then reinstall them as part of the phased project.
  • Reinstall office furniture, artwork, and employee belongings across the renovated floors.
  • Dispose of furniture excluded from the move.

Documented outcome

The office contents were relocated and reinstalled as part of the multi-floor renovation. The completed relocation and disposal record confirms all phases were complete in March 2026.

Two-Floor Furniture Installation · August 2026

Geary Pacific Corporation

Yorba Linda, California

Receiving, delivery, and complete furniture installation across two floors, covering offices, workstations, reception, training, conference, dining, and lounge spaces.

  • Two-floor installation
  • Receiving through final placement
  • Second-floor stair carry

Scope of work

  • Receive and stage the project furniture at Vector's warehouse, then transport it to the Yorba Linda site.
  • Uncrate, assemble, and place furniture across both floors, including private offices, shared workstations, reception, training rooms, conference rooms, dining, and lounge areas.
  • Handle second-floor furniture by stair carry under the approved access scope.
  • Coordinate final placement, a walk-through across both floors, packaging removal, and the included punch visit.

Documented outcome

The two-floor delivery and installation was recorded as completed in August 2026, covering the complete furnishing scope from warehouse receiving through assembly and final placement.

Workplace Furniture Installation · October 2026

GKN Aerospace Transparency

Garden Grove, California

Furniture installation across finance and open-office areas, private offices, training space, and conference rooms, supported by phased receiving and delivery.

  • Finance & open-office areas
  • Training & conference rooms
  • Phased delivery & installation

Scope of work

  • Receive and deliver the specified furniture in multiple deliveries to support the installation sequence.
  • Assemble and install shared workstations, private-office desks, and furniture for the finance and open-office areas.
  • Install training tables, conference and huddle-room furniture, and seating for office, training, and meeting spaces.
  • Coordinate the work around site access and crew protective-equipment requirements, with a completion walk and documented punch items.

Documented outcome

The workplace installation across office, training, and conference areas was recorded as completed, with site sign-off on October 7, 2026.

These are past project examples. Our current local service area is Orange County, Los Angeles County, and the Inland Empire (Riverside and San Bernardino counties). Dealers nationwide can engage Vector for sites within that area. Explore dealer support or local facilities services.

Tell us what your project needs

Dealers, businesses, and facilities teams can send a scope for review. We confirm requirements, pricing, and availability with you before scheduling work.